Ed reviews plans as for the Mechanical Room and Staff Change Rooms / Showers

50% of the structure was set up for the Mechanical Room this week. This is a platform that will elevate the main electrical and venting structure to keep it dry at all times.

50% of the structure was set up for the Mechanical Room this week. This is a platform that will elevate the main electrical and venting structure to keep it dry at all times.

Lifting ducts is heavy and unwieldy. This lifts 400-500 pounds, making the placement much easier.

Lifting ducts is heavy and unwieldy. This lifts 400-500 pounds, making the placement much easier.

Once the ducts are installed, sealant is applied.

Once the ducts are installed, sealant is applied.